Mechanical, electrical & air conditioning engineers01423 770094

Commercial building services

Commercial emergency lighting testing and maintenance

Prepare an emergency lighting test brief for your premises. Identify the escape routes and areas served, previous test records, outstanding defects and when the system can be tested with the building in use.

What should an emergency lighting test record identify?

Ask for the location or reference of each fitting, the test undertaken, anything that could not be tested and the action needed for a defect. Agree how failed or inaccessible fittings will be tracked to a later visit.

For wider work on the lighting system, see commercial lighting upgrades.

Define the work

What to include in an emergency lighting test brief

Agree the requirements and deliverables before the work is arranged.

01

Understand the installation

Start with the emergency lighting inventory, escape strategy, existing logbook and maintenance history. Identify systems and areas needing further specialist assessment.

02

Arrange the right checks

Agree inspection and testing against the applicable system requirements, fire risk assessment and current technical guidance. Plan duration tests so recharge and occupancy risks are managed.

03

Close the gaps

Report failed fittings, batteries and access restrictions. Specify repairs, retesting and the evidence needed to close the action.

A useful record

Make the evidence
part of the agreement.

Confirm what will be provided for the service you choose.

  • An identified system inventory and agreed test scope.
  • Dated test and fault records for the building logbook.
  • Repair and retest evidence for authorised corrective work.

Company project archive

Building services experience.

Explore recorded M&E installations at Rudding Park Hotel, the Bowes Museum and Washburn Heritage Centre.

Review the archived project scopes

Evidence for your requirements.

Ask for the current certificates and scope information relevant to the work you are considering.

Request supplier evidence

Prepare the conversation

Start with what you know.

Tell us the postcode, building use, approximate number of fittings and what records you hold. Mention any failed lights or recent changes to escape routes.

Speak to Robinsons.

Share your postcode and requirements. The team will confirm coverage, scope and the next step.

Discuss your requirements

01423 770094

Before you enquire

Emergency lighting testing questions

Is emergency lighting testing an EICR?

No. A fixed electrical condition report and emergency lighting system testing address different requirements and should be specified separately.

Will one test establish that every escape route is suitable?

Testing the installed equipment is distinct from assessing the overall lighting design and fire strategy. Agree the assessment scope before work begins.

How often should testing happen?

The schedule should follow the applicable technical guidance, system design and fire risk assessment. Avoid treating one generic interval as suitable for every system.

Call our teamMake an enquiry