Fleet depots
We work back from route mileage, return times and first departures. Overnight AC charging may suit most vans, with faster DC charging reserved for vehicles that need to turn round between shifts.
Skip to main content
UK-wide electrical services
Before we specify a charger, we ask when your vehicles need to leave and what else needs power at that hour. Robinsons MEA installs and maintains commercial EV charge points across the UK, from the first bays in a staff car park to a rollout across several depots.
A van between delivery rounds may have 40 minutes to charge. A car parked at the office may have eight hours. That difference shapes how many chargers you need, where they go and how powerful they should be.
We work back from route mileage, return times and first departures. Overnight AC charging may suit most vans, with faster DC charging reserved for vehicles that need to turn round between shifts.
Staff cars often stay for a full shift. Sharing the available power across several bays can give more people access. We also plan how visitors or tenants identify themselves and who pays for each session.
A hotel guest can charge while they sleep. A shopper may have less than an hour. We plan charging speeds, accessible routes and bay locations around that visit, including how drivers find the charger and pay where required.
At survey, we look at your electrical supply, distribution boards and cable routes alongside the heating, cooling and other equipment drawing power. If the kitchens are busiest at lunchtime or loading bays must stay open, that goes into the design.
A failed session can start at the distribution board, the charger or the software that authorises the driver. We agree who investigates each part and who keeps your site manager updated.
We agree visits around the equipment, its use and the manufacturer’s instructions. The scope can include checks on cables, connectors, enclosures and protective devices, plus a test charge. Findings are recorded against the individual unit.
Give us the charger ID, the on-screen message and whether one bay or the whole site is affected. We agree the response with you, involve the manufacturer or software provider where needed, and record the test before a repaired bay returns to use.
After each visit, you can see which bays are working, which need parts and who is following up. We can bring this into your existing electrical maintenance schedule so site managers and head office work from the same information.
At Rudding Park Hotel in Harrogate, Robinsons delivered mechanical and electrical services for a 48-bedroom guest wing and spa extension, including a new low-voltage substation. On your EV project, the same understanding of power distribution helps us assess what the chargers and the building can run together.
Read about the electrical work at Rudding ParkFrom Leeds, we coordinate commercial EV charger installation and maintenance across England, Scotland, Wales and Northern Ireland. Send one postcode or your site list. We’ll agree the rollout, access windows and maintenance arrangements for each location.
Discuss your sites with RobinsonsSend the makes, models, site postcodes and any service history you hold. We’ll review equipment condition, software access, warranties and parts availability, then confirm which units and repairs we can cover.
Two sites with the same number of bays can cost quite different amounts. The cable run from the switchboard, how much tarmac needs opening, the available power and the charging speed all affect the quote. A postcode, bay count and a photo or plan of the proposed area are enough to start the conversation.
We agree who holds the administrator account, who can change access or tariffs and how you get your usage records. Where a third-party platform is proposed, we identify its fees, support contact and any conditions for moving to another provider.
For new bays, send your postcode, vehicle numbers and departure times. For existing equipment, start with the charger make and the issue you need us to solve.