Planned maintenance
Define the assets, visits, reporting and responsibilities for a practical maintenance programme.
Discuss a maintenance programmeCommercial service scope
Assess a proposed commercial heat-pump upgrade against the building’s heat demand, existing emitters, electrical capacity and available plant space. Agree which surveys and design decisions are needed before pricing an installation.
Gather recent consumption information where available, the existing heating layout, typical operating hours and known comfort problems. Record any limits on plant space, electrical capacity or work in occupied areas. Ask which assumptions need a survey before a capital quotation can be relied on.
For proposed changes to electrical demand, see electrical load analysis.
A heating upgrade needs an assessment of how the building is used, the existing plant and distribution, hot-water requirements and available space. Choose the brief around the required outcome rather than a technology label alone.
Discuss emitters, controls, electrical supply, pipework, plant access, operating temperatures and any wider building work. A replacement system should be considered as a coordinated M&E project, with appropriate design responsibility.
Ask for the design assumptions, equipment information, operating expectations and commissioning and handover records. Funding eligibility, specialist registration and projected savings require current, project-specific evidence; assess the current options against the project and the evidence available.
Define the assets, visits, reporting and responsibilities for a practical maintenance programme.
Discuss a maintenance programmeTell us the fault, affected systems and postcode. Call for urgent support and confirmation of attendance arrangements.
Discuss a faultCoordinate installation, plant replacement and refurbishment with testing, commissioning and handover.
Explore projectsInclude the site postcode, building use, systems, access restrictions and required timing. For a project, add the drawings or design information available and the responsibilities already agreed.